
Potterton
Potterton Rear Casing Top Panel White S501405
White rear casing top panel for Potterton Commercial NXR3 boilers, covering the upper rear section of the casing.
£51.60
£43.00 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The Potterton rear casing top panel is a white casing component for Potterton Commercial NXR3 boilers. It forms the upper rear section of the boiler casing, closing off the rear face above the main casing line. It is supplied as a single panel in white finish.
Signs this part needs replacing
- Visible corrosion, rust staining or perforation along the panel
- Dents, buckling or deformation that prevents the panel seating correctly
- Heat discolouration or blistering of the coating
- Casing panels no longer aligning at the rear top edge
- Physical damage sustained during servicing or access to the boiler
Before you order
- Confirm the boiler model and section count against the fit list above
- Check the panel finish required, as this component is supplied in white
- Inspect any adjacent casing panels for damage before refitting
- Verify the existing part number on the boiler matches S501405 where visible
No specification data held for this part.
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| POTTERTON COMMERCIAL NXR3 4 SECTION | — | — | — | |
| POTTERTON COMMERCIAL NXR3 5 SECTION | — | — | — | |
| POTTERTON COMMERCIAL NXR3 6 SECTION | — | — | — | |
| POTTERTON COMMERCIAL NXR3 7 SECTION | — | — | — | |
| POTTERTON COMMERCIAL NXR3 8 SECTION | — | — | — | |
| POTTERTON COMMERCIAL NXR3 9 SECTION | — | — | — | |
| POTTERTON COMMERCIAL POTTERTON COMMERCIAL SPARES | — | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
