Checking hours…Mon–Fri 7:30am–5pm · Sat 9am–12pm01302 279234Trade account
Glow-worm Printed Circuit Board Express 80 S202078

Glow-worm

Glow-worm Printed Circuit Board Express 80 S202078

At a glance

  • Part type: Printed circuit board
  • Appliance family: Express
  • Also known as 1333535, N1008-1
Manufacturer part no.
S202078
GC number
313-012
Showing prices

£272.30

£226.92 ex. VAT · VAT at 20%

In stock
Cut-off passed — dispatches next working day
Not certain it's the right part? The technical team verifies fitment before dispatch — no charge, and it stops a second trip.Call the technical teamSend a technical question

Same-day dispatch

Ordered by 4pm Mon–Fri, 10:30am Sat.

30-day returns

Unused, in original packaging.

What it is

The Glow-worm S202078 is a printed circuit board used as the main control PCB in Glow-worm domestic gas boilers. It carries the boiler's control and sequencing electronics, handling ignition, fan and pump commands, temperature monitoring and fault signalling to the appliance's display or status indicators. This board is listed for the Glow-worm Express 80 model.

Signs this part needs replacing

  • The boiler fails to fire or does not respond when there is a call for heat.
  • The display is blank, unlit or shows no status indication.
  • Repeated lockouts or fault codes that clear only after a power cycle.
  • The fan, pump or ignition sequence does not start despite power at the appliance.
  • Visible damage on the board, such as scorching, burnt tracks or a blown on-board fuse.

Before you order

  • Confirm the GC number on the appliance data badge matches 47-313-04 before ordering.
  • Check the existing board's part number against S202078, and note the earlier number 202078 and the alternative codes 1333535 and N1008-1.
  • Isolate the electrical supply to the boiler before removing or fitting the board, and follow the manufacturer's wiring and configuration instructions.

Not sure which part?

Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.