
Potterton
Potterton Side Casing RH Front White S134321EE
White right-hand front side casing panel for Potterton Commercial NXR3 boilers, supplied as part S134321EE.
At a glance
- Part type: side casing, right-hand front
£116.59
£97.16 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
This is the Potterton right-hand front side casing, finished in white. It is the outer front panel on the right-hand side of the appliance, forming part of the boiler casing assembly. It is listed for Potterton Commercial NXR3 boiler models.
Signs this part needs replacing
- Visible dents, creases or distortion across the panel face
- Corrosion or blistering of the painted finish
- Cracked or torn metal around fixing points or edges
- Panel no longer sits flush against the boiler chassis
- Previous casing damage left exposed or poorly covered
Before you order
- Confirm the casing is the right-hand front panel, not the left-hand or rear section
- Check the appliance model against the NXR3 section list above
- Verify the existing panel's fixing points and shape match the replacement
- Inspect surrounding casing panels for damage before refitting
No specification data held for this part.
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| POTTERTON COMMERCIAL NXR3 4 SECTION | — | — | — | |
| POTTERTON COMMERCIAL NXR3 5 SECTION | — | — | — | |
| POTTERTON COMMERCIAL NXR3 6 SECTION | — | — | — | |
| POTTERTON COMMERCIAL NXR3 7 SECTION | — | — | — | |
| POTTERTON COMMERCIAL NXR3 8 SECTION | — | — | — | |
| POTTERTON COMMERCIAL NXR3 9 SECTION | — | — | — | |
| POTTERTON COMMERCIAL POTTERTON COMMERCIAL SPARES | — | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
