
Broag
Broag Blanking Flange Flow S100431
Broag flow blanking flange for GAS 320 ACE and GAS 620 ACE commercial boilers.
£123.12
£102.60 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The BLANKING FLANGE FLOW is a Broag commercial boiler spare part used to blank off a flow connection on the appliance. It is listed by Broag under the BROAG COMMERCIAL - BROAG SPARE PARTS range and is intended for use on Broag GAS 320 ACE and GAS 620 ACE commercial boilers.
Signs this part needs replacing
- Weeping or staining around the flange face on the flow connection
- Visible corrosion, pitting or scaling on the flange face
- Distortion or damage to the flange sealing face after removal
- Repeated seepage following gasket renewal at the same joint
Before you order
- Confirm the appliance model and output variant against the fit list
- Check the existing flange face and bolt pattern match the replacement
- Confirm the Broag part reference S100431 before ordering
No specification data held for this part.
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| BROAG COMMERCIAL BROAG SPARE PARTS | — | — | — | |
| BROAG COMMERCIAL GAS 320 ACE - 285 | — | — | — | |
| BROAG COMMERCIAL GAS 320 ACE - 355 | — | — | — | |
| BROAG COMMERCIAL GAS 320 ACE - 430 | — | — | — | |
| BROAG COMMERCIAL GAS 320 ACE - 500 | — | — | — | |
| BROAG COMMERCIAL GAS 320 ACE - 575 | — | — | — | |
| BROAG COMMERCIAL GAS 320 ACE - 650 | — | — | — | |
| BROAG COMMERCIAL GAS 620 ACE - 1000 | — | — | — | |
| BROAG COMMERCIAL GAS 620 ACE - 570 | — | — | — | |
| BROAG COMMERCIAL GAS 620 ACE - 710 | — | — | — |
Showing 10 of 11 compatible appliances.
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
