Checking hours…Mon–Fri 7:30am–5pm · Sat 9am–12pm01302 279234Trade account
Morco Products Expansion Vessel MCB2005

Morco Products

Morco Products Expansion Vessel MCB2005

Expansion vessel for Morco FEB-24E series LPG boilers, absorbing pressure changes in the heating circuit.

At a glance

  • Also known as 2500472, N2872-1
Manufacturer part no.
MCB2005
Showing prices

£153.74

£128.12 ex. VAT · VAT at 20%

Available to order · 3 working days
Available to order · 3 working days
Not certain it's the right part? The technical team verifies fitment before dispatch — no charge, and it stops a second trip.Call the technical teamSend a technical question

Same-day dispatch

Ordered by 4pm Mon–Fri, 10:30am Sat.

30-day returns

Unused, in original packaging.

What it is

The MCB2005 is an expansion vessel manufactured by Morco Products for use in its FEB-24E family of LPG boilers. It provides the internal air cushion that absorbs the volume increase of water as the sealed heating circuit heats up, limiting pressure rise across the system. The vessel is charged with air on one side of a diaphragm and connected to the boiler's water circuit on the other.

Signs this part needs replacing

  • System pressure climbs quickly as the boiler heats and falls again once it cools.
  • The pressure relief valve discharges water during normal heating cycles.
  • The boiler repeatedly loses pressure and needs topping up.
  • Water is present at the vessel's air valve when the cap is removed and the valve is depressed.
  • The vessel feels heavy or full of water when disconnected, indicating a failed diaphragm.

Before you order

  • Confirm the boiler model against the fitment list above.
  • Check the existing vessel's part number or manufacturer reference before removing it.
  • Verify the system pressure and expansion vessel charge pressure against the boiler manufacturer's instructions.
  • Isolate the appliance and depressurise the heating circuit before removal.

Not sure which part?

Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.