
SPECIAL OFFERS
Spirotech SpiroExpand EVN 8L Vessel EVN8
SpiroExpand EVN 8-litre expansion vessel for sealed heating systems, absorbing water expansion to help maintain stable system pressure.
£70.56
£58.80 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The SpiroExpand EVN 8L Vessel is an 8-litre expansion vessel in the Spirotech SpiroExpand EVN range. It is fitted to sealed heating systems to absorb the expansion of heated water as the system reaches temperature. This keeps system pressure within a stable working band rather than allowing it to climb as the water volume grows.
Signs this part needs replacing
- System pressure rises sharply when the heating is on, or sits high even when cold
- Pressure falls quickly and the system needs frequent top-ups
- Water or staining appears at the Schrader valve when the air charge is checked
- The vessel feels heavy or sounds full of water when tapped
- The pressure relief valve discharges during normal heating cycles
Before you order
- Check the vessel capacity and pre-charge suit the system volume and the unit being replaced
- Confirm the connection thread, orientation and mounting arrangement match the existing vessel
- Check there is space for a vessel of the same physical size and that the system can be isolated and drained
- Note the reference on the existing vessel so the correct EVN variant is selected
No specification data held for this part.
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| SPECIAL OFFERS Spirotech | — | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No documents held for this part. The technical team will source them from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
