
Flavel Fires
Flavel Fires Burner Pipe Curve B-92050
Curved burner pipe, part B-92050, for Flavel Fires and Kinder Curve and Kamina RC gas fires.
At a glance
- Also known as 2131134
£10.66
£8.88 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The B-92050 is a curved burner pipe supplied by Flavel Fires for use in gas fires. It forms part of the pipe assembly that feeds gas through to the burner, where it is mixed and burned at the fire bed. It is listed for both Flavel Fires and Kinder appliance families.
Signs this part needs replacing
- Visible corrosion, scaling or discolouration on the pipe surface
- Sooting or a yellow, lazy flame at the fire bed
- Unstable or lifting flame that will not settle
- A smell of gas around the burner area
- Poor or inconsistent ignition at the burner
Before you order
- Check the model number on the appliance data plate against the fit list above
- Confirm the existing pipe is marked with, or matches, part number B-92050
- Inspect the pipe ends and connections for damage before fitting
- Gas work must be carried out by a competent, registered engineer
Compliance
| Alternative numbers | 2131134 |
|---|
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| FLAVEL FIRES CURVE BLACK (FCRR00RN) | — | — | — | |
| FLAVEL FIRES CURVE GRAPHITE (FCRRXXRN) | — | — | — | |
| FLAVEL FIRES KAMINA RC (FCRR10RN) | — | — | — | |
| KINDER CURVE BLACK (KCRR00RN) | — | — | — | |
| KINDER CURVE GRAPHITE (KCRRXXRN) | — | — | — | |
| KINDER KAMINA RC (KCRR10RN) | — | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No documents held for this part. The technical team will source them from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
