
Worcester Bosch
Worcester Bosch Mixing Unit 8716117259
Mixing unit for Worcester Bosch Greenstar 9i and 12i ErP System boilers, for NG and LPG models.
At a glance
- Also known as 1031275
£12.37
£10.31 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The Worcester Bosch 8716117259 is a mixing unit for Worcester Bosch Greenstar 9i and 12i ErP System boilers. It forms part of the boiler's hydraulic circuit, where it blends water to help maintain stable operating temperatures.
Signs this part needs replacing
- Fluctuating domestic hot water temperature
- Boiler cycling or overheating
- Unusual noise from the mixing unit area
- Visible leaks or scale around the unit
Before you order
- Check your boiler model and GC number against the fitment list.
- Confirm the part number 8716117259 matches your existing component.
- Verify whether your boiler uses natural gas (NG) or LPG.
Compliance
| GC number | J25-320 |
|---|---|
| Barcode / EAN | 4054925560916 |
| Alternative numbers | 1031275 |
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| WORCESTER GREENSTAR 12i ErP SYSTEM LPG | 41-406-24 | 41-406-24 | — | — |
| WORCESTER GREENSTAR 12i ErP SYSTEM NG | 41-406-23 | 41-406-23 | — | — |
| WORCESTER GREENSTAR 9i ErP SYSTEM LPG | 41-406-22 | 41-406-22 | — | — |
| WORCESTER GREENSTAR 9i ErP SYSTEM NG | 41-406-21 | 41-406-21 | — | — |
| WORCESTER WORCESTER GREENSTAR 12i ErP SYSTEM LPG | — | — | — | |
| WORCESTER WORCESTER GREENSTAR 12i ErP SYSTEM NG | — | — | — | |
| WORCESTER WORCESTER GREENSTAR 9i ErP SYSTEM LPG | — | — | — | |
| WORCESTER WORCESTER GREENSTAR 9i ErP SYSTEM NG | — | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
