Checking hours…Mon–Fri 7:30am–5pm · Sat 9am–12pm01302 279234Trade account
Worcester Bosch Centrifugal Blower Cables 87144112940

Worcester Bosch

Worcester Bosch Centrifugal Blower Cables 87144112940

Centrifugal blower cables for Worcester Bosch gas boilers, used to connect the blower fan.

At a glance

  • Also known as CENTRIFUGAL-BLOWER-CABLES, 1012917
Manufacturer part no.
87144112940
Showing prices

£68.62

£57.18 ex. VAT · VAT at 20%

Available to order · 1 working day
Available to order · 1 working day
Not certain it's the right part? The technical team verifies fitment before dispatch — no charge, and it stops a second trip.Call the technical teamSend a technical question

Same-day dispatch

Ordered by 4pm Mon–Fri, 10:30am Sat.

30-day returns

Unused, in original packaging.

What it is

The centrifugal blower cables are a Worcester Bosch wiring assembly for the centrifugal blower fan fitted to Worcester gas boilers. The cables carry the supply and control connections between the blower motor and the boiler's control system, allowing the fan to run at the speed demanded by the appliance. They are supplied as a service part for the model listed below.

Signs this part needs replacing

  • The blower fan does not run and the boiler locks out on a fan-related fault
  • The fan runs intermittently or cuts out while the boiler is firing
  • Visible damage to the cable insulation, such as chafing, heat damage or exposed conductors
  • Loose, corroded or heat-affected terminals at the blower or control end of the cable
  • A fan-related fault code returns after the fan itself has been checked

Before you order

  • Confirm the boiler model matches the fitment listed above
  • Check the existing cable routing and connector type at both the blower and control ends
  • Inspect the blower motor and PCB for faults that could be the cause rather than the cable
  • Have the manufacturer part number 87144112940 to hand when ordering

Not sure which part?

Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.