Checking hours…Mon–Fri 7:30am–5pm · Sat 9am–12pm01302 279234Trade account
Potterton Combustion Chamber / C Frame 7660873

Potterton

Potterton Combustion Chamber / C Frame 7660873

Combustion chamber / C frame for Potterton Commercial Sirius 2 and Sirius 3 WH50, WH60 and WH70 boilers.

Manufacturer part no.
7660873
Showing prices

£157.20

£131.00 ex. VAT · VAT at 20%

Available to order · 3 working days
Available to order · 3 working days
Not certain it's the right part? The technical team verifies fitment before dispatch — no charge, and it stops a second trip.Call the technical teamSend a technical question

Same-day dispatch

Ordered by 4pm Mon–Fri, 10:30am Sat.

30-day returns

Unused, in original packaging.

What it is

This is the combustion chamber / C frame listed by Potterton for Potterton Commercial appliances. It forms the enclosure around the burner and heat exchanger area on the Sirius 2 and Sirius 3 boiler ranges, and is supplied as the chamber housing assembly for the 50 kW and 60 kW variants named in the part description. Manufacturer part number 7660873.

Signs this part needs replacing

  • Visible cracking, splitting or perforation of the chamber panels or C frame
  • Distortion or warping of the frame after overheating
  • Heavy corrosion, scale or heat discolouration across the chamber surfaces
  • Damaged or pitted sealing faces where the chamber gasket seats
  • Flue gas leakage, combustion readings outside tolerance or a CO alarm on the appliance

Before you order

  • Confirm the appliance model and output against the fitment list above, as the WH70 appears in the Sirius 2 list
  • Check whether the appliance is a Sirius 2 unit installed from April 2016 where that build date applies to your model
  • Inspect the existing chamber gasket and fixings, as these are separate items and are not part of this listing
  • Compare the existing chamber / C frame pattern and mounting points with the unit before fitting

Not sure which part?

Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.