
Altecnic
Altecnic Sepcoll Hydraulic Separator Manifold 2+2 559022
Altecnic Sepcoll hydraulic separator manifold with a 2+2 connection layout, supplied with insulation and mounting brackets.
£1,254.68
£1,045.57 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The Altecnic Sepcoll is a hydraulic separator manifold forming part of the Altecnic range of dirt and air separation products. It hydraulically decouples the primary and secondary circuits in a heating system while allowing dirt and air to be removed from the water. This version has a 2+2 connection layout and is supplied with insulation and brackets.
Signs this part needs replacing
- Persistent air noise or gurgling that continues after the separator has been vented
- Dirt or magnetite collecting in the system despite regular cleaning
- Poor separation between primary and secondary circuits, with flow and return temperature imbalance
- Leaks or weeping at the manifold body or connections
Before you order
- Confirm the connection layout required for the installation matches the 2+2 arrangement
- Check the pipework sizes and circuit requirements against the manifold connections
- Verify that insulation and brackets are required for the installation, as both are supplied with this item
- Check the surrounding pipework and system volume are suitable for a hydraulic separation manifold
No specification data held for this part.
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| ALTECNIC Dirt and Air Seperation | — | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No documents held for this part. The technical team will source them from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
