
Altecnic
Altecnic Dirt And Air Separation G 2 F/F BSP With Insulation 546119
Altecnic dirt and air separation connection with G 2 inch female BSP threads at both ends, supplied with insulation.
£2,076.06
£1,730.05 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
This is a G 2 F/F BSP connection supplied with insulation, manufactured by Altecnic for use with its dirt and air separation units. It forms part of the pipework arrangement on an Altecnic dirt and air separation assembly, where it handles the connection between the separator body and the system pipework. The 2 inch female BSP threads are provided at both ends.
Signs this part needs replacing
- Air continuing to circulate in the system with audible gurgling or whooshing at the separator
- Radiators or emitters failing to heat fully despite the separator being in place
- Visible weeping or seepage at the threaded connections
- Damaged or degraded insulation on the connection
- Sludge or corrosion debris escaping at the joint during servicing
Before you order
- Confirm the connection is G 2 female BSP at both ends against the existing pipework
- Check the appliance model to confirm it is an Altecnic dirt and air separation unit
- Verify whether the existing installation requires the insulated version of this connection
- Inspect the surrounding pipework and joints for damage before fitting
No specification data held for this part.
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| ALTECNIC Dirt and Air Seperation | — | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No documents held for this part. The technical team will source them from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
