
Altecnic
Altecnic Discal DN65 Flanged PN16 Dirt and Air Separator with Insulation 546062
Altecnic Discal DN65 flanged PN16 dirt and air separator supplied with insulation.
£5,783.11
£4,819.26 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The Discal DN65 flanged PN16 Dirt and Air Separator with insulation is a system component from Altecnic, part of the Discal dirt and air separation range. It removes dirt particles and entrained air from heating and cooling system water, helping to protect pumps, valves and heat emitters from contamination and air-related faults. This version is supplied with insulation.
Signs this part needs replacing
- Persistent air noise, gurgling or radiator cold spots that are not cleared by venting or flushing
- Repeated blockages, sluggish circulation or dirty system water despite cleaning
- Sludge or magnetite build-up found at the separator on inspection or during servicing
- Leaks, weeping joints or corrosion at the separator body or flanged connections
- Reduced system performance traced to poor dirt or air separation
Before you order
- Confirm the system pipework is DN65 and flanged to suit this unit
- Check that the system pressure rating is compatible with PN16
- Check available space for the separator body and its insulation
- Verify the Discal model reference against the existing unit or system design
No specification data held for this part.
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| ALTECNIC Dirt and Air Seperation | — | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No documents held for this part. The technical team will source them from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
