Checking hours…Mon–Fri 7:30am–5pm · Sat 9am–12pm01302 279234Trade account
Altecnic Pressure Reducing Valve 3/4M with Gauge 536051

Altecnic

Altecnic Pressure Reducing Valve 3/4M with Gauge 536051

Altecnic 3/4M pressure reducing valve with an integral gauge for controlling downstream water pressure.

Manufacturer part no.
536051
Showing prices

£324.30

£270.25 ex. VAT · VAT at 20%

Available to order · 3 working days
Available to order · 3 working days
Not certain it's the right part? The technical team verifies fitment before dispatch — no charge, and it stops a second trip.Call the technical teamSend a technical question

Same-day dispatch

Ordered by 4pm Mon–Fri, 10:30am Sat.

30-day returns

Unused, in original packaging.

What it is

The Altecnic 3/4M Pressure Reducing Valve with gauge is a brass-bodied pressure control valve for use on water supply pipework in heating and plumbing systems. It reduces a higher incoming supply pressure to a stable, regulated outlet pressure and incorporates a gauge so the set pressure can be read at the valve. It sits within the Altecnic Pressure Reducing Valves range.

Signs this part needs replacing

  • Outlet pressure creeps up or fluctuates instead of holding a steady set value.
  • The gauge needle sticks, reads zero, or no longer responds to changes in pressure.
  • Water weeps from the valve body, bonnet or gauge connection.
  • Downstream flow drops noticeably or the valve becomes noisy in service.
  • Pressure at outlets is higher than the set value and the adjuster no longer changes it.

Before you order

  • Confirm the pipework connection is 3/4M and matches the existing valve.
  • Check the valve is being fitted within the Altecnic Pressure Reducing Valves range for the application.
  • Check there is enough clearance around the valve body for the gauge and for adjustment access.
  • Note the set outlet pressure required before installation so the valve can be adjusted on commissioning.

Not sure which part?

Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.