Checking hours…Mon–Fri 7:30am–5pm · Sat 9am–12pm01302 279234Trade account
Sime Fitting Cocks Kit 5184817

Sime

Sime Fitting Cocks Kit 5184817

Fitting cocks kit for Sime gas boilers, part number 5184817, used to isolate the gas supply during servicing and repair.

At a glance

  • Also known as 2043080
Manufacturer part no.
5184817
Showing prices

£110.14

£91.78 ex. VAT · VAT at 20%

Available to order · 7 working days
Available to order · 7 working days
Not certain it's the right part? The technical team verifies fitment before dispatch — no charge, and it stops a second trip.Call the technical teamSend a technical question

Same-day dispatch

Ordered by 4pm Mon–Fri, 10:30am Sat.

30-day returns

Unused, in original packaging.

What it is

The Sime 5184817 fitting cocks kit is an isolation valve kit supplied for Sime gas boilers, listed under the 25 ECOMF NG valve kit reference. It provides the cocks used to isolate the gas supply to the appliance so that servicing, testing and component replacement can be carried out safely. The kit is intended for natural gas applications across a range of Sime domestic boiler families.

Signs this part needs replacing

  • The isolation cock weeps or leaks gas or water at the spindle or body.
  • The valve spindle is seized and will not turn, so the appliance cannot be isolated.
  • The cock will not shut off fully, leaving the gas supply passing when it should be closed.
  • Corrosion, cracking or deformation is visible on the valve body or connections.
  • A joint at the cock has been disturbed and will not seal reliably on reassembly.

Before you order

  • Confirm the boiler model and GC number against the fitment list above.
  • Check whether the appliance is the time clock or without time clock variant where this applies.
  • Confirm the appliance is natural gas, as this kit is specified for NG.
  • Check the existing valve arrangement on the appliance matches the kit before ordering.

Not sure which part?

Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.