
Potterton
Potterton Condense Drain Trap Assembly 5132544
Condensate drain trap assembly for Potterton Commercial GOLD and Sirius boilers, part number 5132544.
£14.40
£12.00 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The Potterton Condense Drain Trap Assembly, part number 5132544, is a condensate trap used on Potterton Commercial gas boilers. It collects condensate produced during combustion and forms a water seal that allows the condensate to drain away while preventing flue gases from passing back through the condensate route.
Signs this part needs replacing
- Water leaking from the trap body or its connections
- Condensate backing up or overflowing around the boiler casing
- The boiler locking out or shutting down with a condensate-related fault
- Visible cracks, splits or physical damage to the trap
- A persistent blockage in the trap that cannot be cleared by cleaning
Before you order
- Confirm your appliance model appears in the fitment list above
- Check the part number 5132544 against the existing component or the appliance manual
- Inspect the trap and its associated pipework for damage or blockage before replacing
- Verify whether your appliance is from the GOLD or Sirius series
No specification data held for this part.
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| POTTERTON COMMERCIAL GOLD WH46 | — | — | — | |
| POTTERTON COMMERCIAL GOLD WH65 | — | — | — | |
| POTTERTON COMMERCIAL POTTERTON COMMERCIAL SPARES | — | — | — | |
| POTTERTON COMMERCIAL SIRIUS WH50 | — | — | — | |
| POTTERTON COMMERCIAL SIRIUS WH60 | — | — | — | |
| POTTERTON COMMERCIAL SIRIUS WH70 | — | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
