
Potterton
Potterton Lower Support 5132487
Lower support for Potterton Commercial Gold and Sirius WH series gas boilers, part number 5132487.
£8.76
£7.30 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The lower support is a Potterton Commercial component used on Gold and Sirius WH series gas boilers. It provides the lower mounting support within the appliance assembly, holding the supported section in its correct position. This is part number 5132487.
Signs this part needs replacing
- Visible corrosion, scaling or thinning of the metal around the mounting points
- Cracks or fractures at welds, bends or fixing holes in the support
- The supported component sitting loose, misaligned or able to move in service
- Rattling or knocking from the lower section of the boiler during operation
- Distortion of the support following overheating or earlier work on the appliance
Before you order
- Confirm the boiler model matches one of the fit lines listed above
- Check the part number against the marking on the existing support before ordering
- Inspect the mounting points and fixings for damage, corrosion or stripped threads
- Confirm whether any associated gaskets, seals or fastenings are also required
No specification data held for this part.
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| POTTERTON COMMERCIAL GOLD WH46 | — | — | — | |
| POTTERTON COMMERCIAL GOLD WH65 | — | — | — | |
| POTTERTON COMMERCIAL POTTERTON COMMERCIAL SPARES | — | — | — | |
| POTTERTON COMMERCIAL SIRIUS WH50 | — | — | — | |
| POTTERTON COMMERCIAL SIRIUS WH60 | — | — | — | |
| POTTERTON COMMERCIAL SIRIUS WH70 | — | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
