Checking hours…Mon–Fri 7:30am–5pm · Sat 9am–12pm01302 279234Trade account
Potterton Gas Valve Assembly 501790

Potterton

Potterton Gas Valve Assembly 501790

At a glance

  • Part type: Gas valve assembly
  • Also known as 1123317
  • This part is fitted to a gas appliance; installation must be carried out by a Gas Safe registered engineer.
Manufacturer part no.
501790
GC number
E84-804
Showing prices

£264.72

£220.60 ex. VAT · VAT at 20%

In stock
Order within 31m for same-day dispatch
Not certain it's the right part? The technical team verifies fitment before dispatch — no charge, and it stops a second trip.Call the technical teamSend a technical question

Same-day dispatch

Ordered by 4pm Mon–Fri, 10:30am Sat.

30-day returns

Unused, in original packaging.

What it is

The Potterton 501790 is a gas valve assembly used across the Potterton Osprey CFL range of floor-standing boilers. It regulates the supply of gas to the burner, opening and closing in step with the appliance's ignition and control sequence. The part is supplied as a complete valve assembly, so the full unit is renewed rather than its internal components.

Signs this part needs replacing

  • The boiler fails to light, or locks out with no gas reaching the burner
  • The flame drops out shortly after ignition and the appliance shuts down
  • Intermittent firing, with the boiler running for short periods before locking out
  • The valve does not close off cleanly once demand ends
  • Corrosion, debris or visible damage around the valve body or its connections

Before you order

  • Confirm the appliance model and GC number against the compatibility list before ordering.
  • Check whether the valve joint gasket or seal needs renewing at the same time.
  • Have the alternative part number 1123317 to hand if cross-referencing against older documentation.
  • This part is fitted to a gas appliance; installation must be carried out by a Gas Safe registered engineer.

Not sure which part?

Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.