
Potterton
Potterton Combustion Chamber Front Insulation 5000538
Combustion chamber front insulation for Potterton Suprima L series boilers, part number 5000538.
At a glance
- Also known as 1123233
£10.96
£9.13 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The Potterton 5000538 combustion chamber front insulation is a boiler insulation component. It fits Potterton Suprima L series gas boilers and forms the front lining of the combustion chamber. Its role is to insulate the chamber front, helping to manage heat within the appliance.
Signs this part needs replacing
- Cracking, crumbling or flaking of the insulation material
- Discolouration or scorch marks on the front insulation panel
- The insulation becoming brittle, loose or detached from its mounting
- Insulation debris or dust found within the combustion chamber
Before you order
- Confirm the boiler is a Potterton Suprima L model from the list above.
- Check the existing insulation for the part number 5000538 where it is visible.
- Isolate the boiler and follow safe working practice before removing any combustion chamber components.
Compliance
| GC number | 114-851 |
|---|---|
| Barcode / EAN | 5039177639015 |
| Alternative numbers | 1123233 |
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| POTTERTON SUPRIMA 100 L | 41-590-48 | 41-590-48 | — | — |
| POTTERTON SUPRIMA 30 L | 41-590-42 | 41-590-42 | — | — |
| POTTERTON SUPRIMA 40 L | 41-590-43 | 41-590-43 | — | — |
| POTTERTON SUPRIMA 50 L | 41-590-44 | 41-590-44 | — | — |
| POTTERTON SUPRIMA 60 L | 41-590-45 | 41-590-45 | — | — |
| POTTERTON SUPRIMA 80 L | 41-590-47 | 41-590-47 | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
