
Warmflow
Warmflow 12 Litre Pressure Vessel 2128
Warmflow 12 litre pressure vessel, part 2128, for Warmflow oil combi boilers.
At a glance
- Also known as 2410004
£121.06
£100.88 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The Warmflow 2128 is a 12 litre pressure vessel supplied for Warmflow oil combi boilers. It provides the expansion capacity within the sealed heating circuit, absorbing the volume change of the system water as it heats and cools. It is listed under expansion vessels in the Warmflow boiler spares range.
Signs this part needs replacing
- System pressure rises quickly when the boiler heats up and falls again once it cools.
- The pressure relief valve discharges water during normal heating cycles.
- Water is found at the vessel's Schrader valve when the charge is checked, indicating a failed internal diaphragm.
- The vessel feels heavy or full of water when tapped, rather than hollow.
- The boiler locks out or cuts out on pressure-related faults.
Before you order
- Confirm the appliance is a Warmflow oil combi model.
- Check the existing vessel's capacity is 12 litres before ordering.
- Verify the system pressure and expansion vessel charge have been checked with an accurate gauge.
- Confirm the connection size and orientation of the existing vessel match the replacement.
Compliance
| Barcode / EAN | 8018000057414 |
|---|---|
| Alternative numbers | 2410004 |
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| WARMFLOW WARMFLOW OIL WARMFLOW: COMBIS | — | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No documents held for this part. The technical team will source them from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
