
Vokera
Vokera Safety Valve 20188993
Safety valve for Vokera EASI-HEAT I and VIBE MAX boilers, part number 20188993.
At a glance
- Also known as 1535546
£13.84
£11.53 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The Vokera 20188993 is a safety valve used across the Vokera EASI-HEAT I and VIBE MAX boiler ranges. It relieves excess pressure from the appliance and system when the set limit is exceeded, helping to protect the boiler and connected pipework. It is supplied as a standalone component.
Signs this part needs replacing
- Water discharging from the pressure relief pipework when the system is not overheating
- System pressure dropping repeatedly or failing to hold
- Visible weeping or dripping from the valve body
- The valve fails to reseat after operating
- Corrosion or scale build-up around the valve outlet
Before you order
- Confirm your appliance model against the fitment list above.
- Check the part number on the existing valve matches 20188993.
- Some EASI-HEAT I models are listed in both NG and LPG variants, so identify which applies to your appliance.
Compliance
| Alternative numbers | 1535546 |
|---|
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| VOKERA EASI-HEAT i 20S | — | — | — | |
| VOKERA EASI-HEAT i 25C LPG | — | — | — | |
| VOKERA EASI-HEAT i 25C NG | 47-364-71 | 47-364-71 | — | — |
| VOKERA EASI-HEAT i 25S | — | — | — | |
| VOKERA EASI-HEAT i 29C LPG | — | — | — | |
| VOKERA EASI-HEAT i 29C NG | 47-364-72 | 47-364-72 | — | — |
| VOKERA VIBE MAX 20S | — | — | — | |
| VOKERA VIBE MAX 25S | — | — | — | |
| VOKERA VIBE MAX 26C | — | — | — | |
| VOKERA VIBE MAX 30C | — | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
