
Vokera
Vokera Cock 20040979
Vokera isolation cock, part number 20040979, for Verve ERP and Verve System 47KW gas boilers.
At a glance
- Part type: cock (isolation valve)
- Appliance family: Vokera Verve
- Also known as 1533751
£45.60
£38.00 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The Vokera 20040979 is an isolation cock used on Vokera Verve gas boilers. It forms part of the boiler's isolation valve arrangement, allowing the flow through the relevant pipework to be shut off for servicing or component replacement. It is listed by Vokera under isolation valves within the boiler spares range.
Signs this part needs replacing
- Visible water weeping or dripping from the valve body or spindle
- The handle turns stiffly, binds, or will not move through its full travel
- The valve fails to shut off flow when closed, so the section cannot be isolated
- Corrosion, scale or staining around the valve body or gland
- A persistent drip from the spindle gland after the valve has been operated
Before you order
- Confirm the boiler model against the fitment list above
- Check the GC number on the appliance data badge matches the boiler you are working on
- Verify the existing valve's position and function on the appliance before removal
- Confirm the part number 20040979 against the manufacturer's parts list for your model
Compliance
| Alternative numbers | 1533751 |
|---|
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| VOKERA VERVE ERP (BOILER CODE 20102705) | 41-094-75 | 41-094-75 | — | — |
| VOKERA VERVE SYSTEM 47KW | 41-094-75 | 41-094-75 | — | — |
| VOKERA VOKERA VERVE SYSTEM 47KW | — | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
