
Ideal
Ideal Control Box Assembly 180827
Control box assembly for Ideal Morco Series III GB24 and GB30 appliances, in LPG and NG variants.
At a glance
- Appliance family: Morco Series III
- Also known as 1782994
£331.31
£276.09 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The Ideal 180827 is a control box assembly used on Morco Series III appliances. It houses the control and switching components that manage the appliance's operating sequence. It is supplied as a complete assembly for the GB24 and GB30 models in both LPG and NG variants.
Signs this part needs replacing
- The appliance fails to power up or respond when switched on
- No display, indicator or control response at the control box
- Intermittent operation or the appliance cutting out without a clear fault elsewhere
- Visible damage, scorching or corrosion on the control box or its connections
- Repeated faults traced to the control box during diagnosis
Before you order
- Confirm the appliance model matches one of the fitments listed above
- Check the existing control box part number against 180827
- Verify whether the appliance is the LPG or NG variant
- Inspect the wiring and connections before replacing the assembly
Compliance
| Alternative numbers | 1782994 |
|---|
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| IDEAL MORCO SERIES III GB24 LPG | — | — | — | |
| IDEAL MORCO SERIES III GB24 NG | — | — | — | |
| IDEAL MORCO SERIES III GB30 LPG | — | — | — | |
| IDEAL MORCO SERIES III GB30 NG | — | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No documents held for this part. The technical team will source them from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
