Checking hours…Mon–Fri 7:30am–5pm · Sat 9am–12pm01302 279234Trade account
Ideal Printed Circuit Board BCC Card Logic 18 175957

Ideal

Ideal Printed Circuit Board BCC Card Logic 18 175957

Ideal 175957 BCC card PCB for Logic, Logic Heat and Logic System 18 boilers, controlling sensors, switches and thermostats.

At a glance

  • Part type: Printed circuit board (PCB)
  • Also known as 1781626
Manufacturer part no.
175957
Showing prices

£34.54

£28.78 ex. VAT · VAT at 20%

In stock
Cut-off passed — dispatches next working day
Not certain it's the right part? The technical team verifies fitment before dispatch — no charge, and it stops a second trip.Call the technical teamSend a technical question

Same-day dispatch

Ordered by 4pm Mon–Fri, 10:30am Sat.

30-day returns

Unused, in original packaging.

What it is

The Ideal 175957 is a printed circuit board (PCB) supplied as a BCC card kit for the Logic range of boilers. It is the central control board, monitoring and governing every process in the appliance through the sensors, switches and thermostats connected to it, and it enforces the boiler's safety routines. This board is listed for Logic, Logic Heat and Logic System 18 models, including Ideal Commercial applications.

Signs this part needs replacing

  • The boiler goes to lockout or shows a fault code that points to the control board
  • No display, no response to the controls, or the boiler will not attempt to fire
  • The fan, pump or ignition sequence fails to run when there is a call for heat
  • Intermittent or erratic operation that does not trace back to a sensor, switch or thermostat
  • Visible damage, moisture tracking or burning on the board itself

Before you order

  • Check the GC number on the appliance data badge against the numbers listed above before ordering
  • Confirm the model name and, where relevant, the serial number, as the Logic, Logic Heat and Logic System variants use different board configurations
  • Cross-check the alternative number 1781626 if you are matching against an older listing
  • Work on the boiler controls should be carried out by a competent person, with the appliance isolated and made safe first

Not sure which part?

Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.