
Ideal
Ideal Control Box Lens 175714
Replacement control box lens for Ideal Logic and Keston gas boilers, part number 175714.
At a glance
- Part type: Lamps & Neons
£14.00
£11.67 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The Ideal 175714 Control Box Lens is a lamps and neons component for Ideal gas boilers. It is the clear cover fitted over the control box, allowing the boiler's status indicator lights to be seen from the outside.
Before you order
- Confirm your boiler model and GC number against the fitment list above before ordering.
- Check the existing lens for cracks or damage so you know the replacement is needed.
- Ensure the boiler is isolated from the electrical supply before removing the control box cover.
No specification data held for this part.
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| IDEAL LOGIC + COMBI 24 | 47-348-65 | 47-348-65 | — | — |
| IDEAL LOGIC + COMBI 30 | 47-348-66 | 47-348-66 | — | — |
| IDEAL LOGIC + COMBI 35 | 47-348-67 | 47-348-67 | — | — |
| KESTON 30C COMBINATION BOILER | 47-930-03 | 47-930-03 | — | — |
| KESTON COMBI 30 BOILER | 47-930-04 | 47-930-04 | — | — |
| KESTON COMBI 35 BOILER | 47-930-05 | 47-930-05 | — | — |
| KESTON SYSTEM 30 BOILER | 41-930-39 | 41-930-39 | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
IDEAL appliance manual — LOGIC + COMBI 24 (GC 47-348-65), LOGIC + COMBI 30 (GC 47-348-66), LOGIC + COMBI 35 (GC 47-348-67)
manualmanualKESTON appliance manual — 30C COMBINATION BOILER (GC 47-930-03)
manualmanualKESTON appliance manual — COMBI 30 BOILER (GC 47-930-04), COMBI 35 BOILER (GC 47-930-05)
manualmanualKESTON appliance manual — SYSTEM 30 BOILER (GC 41-930-39)
manualNo technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
