Checking hours…Mon–Fri 7:30am–5pm · Sat 9am–12pm01302 279234Trade account
Ideal Body Insulation 6 Section 172886

Ideal

Ideal Body Insulation 6 Section 172886

Ideal body insulation, 6 section, part 172886 (previously 85755512), for Ideal Commercial Buccaneer GTE and GTE6 boiler bodies.

At a glance

  • Part type: Insulation (body insulation, 6 section)
  • Also known as 1179131
Manufacturer part no.
172886
Showing prices

£185.87

£154.89 ex. VAT · VAT at 20%

Available to order · 3 working days
Available to order · 3 working days
Not certain it's the right part? The technical team verifies fitment before dispatch — no charge, and it stops a second trip.Call the technical teamSend a technical question

Same-day dispatch

Ordered by 4pm Mon–Fri, 10:30am Sat.

30-day returns

Unused, in original packaging.

What it is

The Ideal body insulation is a six-section thermal insulation component that wraps the boiler body on Ideal Commercial Buccaneer appliances. It is supplied under part number 172886, previously listed as 85755512. Its job is to hold heat inside the boiler body rather than letting it escape into the casing and the room, which keeps surface temperatures down and supports steady operating efficiency.

Signs this part needs replacing

  • Visible cracking, crumbling or breakdown of the insulation sections on the boiler body
  • Sections that have come loose, dropped away or no longer sit flush against the body
  • Casing or outer panels running noticeably hotter than normal in service
  • Heat loss around the boiler body with no other obvious cause
  • Insulation that has been soaked, contaminated or damaged during earlier work on the appliance

Before you order

  • Confirm the appliance model and serial number against the compatibility list before ordering, as the Buccaneer range uses several body configurations
  • Check the number on the existing insulation or the appliance documentation; earlier builds may carry 85755512 rather than 172886
  • Inspect any seals, gaskets or fixings disturbed during removal and replace them if they are perished or damaged
  • Work on the boiler body should be carried out by a competent engineer, with the appliance isolated and cooled before the insulation is removed

Not sure which part?

Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.