Checking hours…Mon–Fri 7:30am–5pm · Sat 9am–12pm01302 279234Trade account
Ideal Top Insulation 172191

Ideal

Ideal Top Insulation 172191

Ideal 172191 top insulation panel for Ideal Commercial Concord ES260/H CPT and ESi 260 CPT boilers, previously listed as 8358-4043.

At a glance

  • Part type: Insulation
  • Appliance family: Ideal Commercial Concord
  • Also known as TOP-INSULATION-8358-4043, 1178576
Manufacturer part no.
172191
Showing prices

£121.50

£101.25 ex. VAT · VAT at 20%

Available to order · 3 working days
Available to order · 3 working days
Not certain it's the right part? The technical team verifies fitment before dispatch — no charge, and it stops a second trip.Call the technical teamSend a technical question

Same-day dispatch

Ordered by 4pm Mon–Fri, 10:30am Sat.

30-day returns

Unused, in original packaging.

What it is

The Ideal 172191 is a top insulation panel supplied for Ideal Commercial Concord boiler appliances. It is the shaped insulating component that sits at the upper section of the appliance, where it limits heat loss from the hot parts of the boiler and shields adjacent components and casing panels from prolonged heat exposure.

Insulation of this type is a serviceable item rather than a moving part. It degrades through heat cycling and physical handling, so it is normally replaced when the top section of the boiler is opened for repair or when the original material has broken down.

Signs this part needs replacing

  • The insulation is cracked, crumbling or breaking up when the top panel is removed
  • Visible charring, scorching or heavy discolouration across the panel surface
  • The material has compressed or sagged away from its original position
  • Casing or nearby components running noticeably hotter than normal
  • The panel is torn or partially missing after previous service work

Before you order

  • Confirm the boiler model and serial number against the compatibility list before ordering, as Concord variants differ
  • Check the previous number 8358-4043 against any documentation held for the appliance
  • Inspect the surrounding seals and fixings while the top section is open, and replace any that are perished
  • Work on the appliance should be carried out by a competent person, with the boiler isolated and cooled before the top insulation is removed

Not sure which part?

Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.