
Vokera
Vokera Safety Valve Connecting Pipe 106339
Vokera safety valve connecting pipe, part number 106339, for Condexa PRO boilers.
At a glance
- Appliance family: Condexa PRO
- Also known as 1534830
£32.04
£26.70 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The Vokera 106339 is a safety valve connecting pipe used on Vokera Condexa PRO boilers. It links the safety valve to the appliance's hydraulic circuit, carrying the discharge path away from the valve body. It is supplied as a single pipe assembly for the Condexa PRO range.
Signs this part needs replacing
- Water weeping or damp traces around the pipe connections
- System pressure dropping repeatedly with no other visible cause
- Corrosion, scale build-up or pitting on the pipe surface
- Cracking, distortion or a loose fit at either end of the pipe
- Water escaping from the safety valve discharge route
Before you order
- Confirm your boiler model against the Condexa PRO fitment list above
- Check the part number 106339 against the manufacturer's parts list for your appliance
- Inspect the safety valve and its connections before ordering, as more than one component may need attention
- Verify the pipe routing and connection points on your appliance match the part being replaced
Compliance
| Alternative numbers | 1534830 |
|---|
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| VOKERA CONDEXA PRO 100M | — | — | — | |
| VOKERA CONDEXA PRO 100S | — | — | — | |
| VOKERA CONDEXA PRO 50M | — | — | — | |
| VOKERA VOKERA CONDEXA PRO 100M | — | — | — | |
| VOKERA VOKERA CONDEXA PRO 100S | — | — | — | |
| VOKERA VOKERA CONDEXA PRO 50M | — | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
