
Vokera
Vokera LPG Conversion Kit 01005500
Vokera conversion kit for changing Compact 24 SE and Mynute 24 SE boilers from natural gas to LPG.
At a glance
- Also known as 1533902
£16.02
£13.35 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The Vokera LPG Conversion Kit (part number 01005500) contains the components required to convert a Vokera gas boiler from natural gas operation to LPG operation. It is intended for use with the Vokera Compact 24 SE and Mynute 24 SE appliance families. Fitting the kit allows the boiler to run correctly on an LPG supply rather than mains natural gas.
Signs this part needs replacing
- The boiler is being installed or operated on an LPG supply but remains set up for natural gas.
- Combustion readings are outside the expected range for the gas supply in use.
- The appliance has been moved to a property or location served by LPG rather than mains gas.
- A conversion has been started but the required kit components are missing or incomplete.
Before you order
- Confirm the boiler model and GC number against the manufacturer's parts list.
- Confirm the gas type the boiler is currently set for and the gas type it will run on.
- Check whether a conversion kit has already been fitted to the appliance.
- Verify the part number 01005500 matches the kit listed for your boiler.
Compliance
| Alternative numbers | 1533902 |
|---|
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| VOKERA COMPACT 24 SE | 47-364-06 | 47-364-06 | — | — |
| VOKERA MYNUTE 24 SE | 41-094-73 | 41-094-73 | — | — |
| VOKERA VOKERA COMPACT 24 SE | — | — | — | |
| VOKERA VOKERA MYNUTE 24 SE | — | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
