
Glow-worm
Glow-worm Front Panel 0020212927
Glow-worm front panel for Home, Easicom 3 and Ultimate 2/3 S series boilers.
£97.42
£81.18 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The front panel is the outer casing cover for Glow-worm Home, Easicom 3 and Ultimate 2/3 S series boilers. It forms the visible front face of the appliance, enclosing the combustion and control components behind it. The panel is supplied as a single casing component for service and repair work.
Signs this part needs replacing
- Visible dents, cracks or deformation in the panel
- Corrosion or rust staining across the panel surface
- Paint flaking or blistering from heat exposure
- Panel no longer seats correctly or its fixings will not hold
- Panel damaged during servicing or removal
Before you order
- Confirm the boiler model and GC number against the fitment list above
- Check the existing panel for any additional fixings or seals that are reused
- Verify the part number 0020212927 matches the number on the existing panel
No specification data held for this part.
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| GLOWWORM EASICOM 3 25S | 41-019-49 | 41-019-49 | — | — |
| GLOWWORM HOME 12S | — | — | — | |
| GLOWWORM HOME 12S | 41-019-27 | 41-019-27 | — | — |
| GLOWWORM HOME 15S | — | — | — | |
| GLOWWORM HOME 15S | 41-019-28 | 41-019-28 | — | — |
| GLOWWORM HOME 18S | 41-019-29 | 41-019-29 | — | — |
| GLOWWORM HOME 18S | — | — | — | |
| GLOWWORM HOME 25S | 41-019-30 | 41-019-30 | — | — |
| GLOWWORM HOME 25S | — | — | — | |
| GLOWWORM ULTIMATE 2 25S | 41-019-42 | 41-019-42 | — | — |
Showing 10 of 11 compatible appliances.
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
