
Glow-worm
Glow-worm Gas Connection Tube 0020097313
Gas connection tube 0020097313 for Glow-worm Ultracom 2 30SXI and 35CXI boilers.
At a glance
- Appliance family: Ultracom 2
- Also known as 1340366
- Gas-carrying components must be fitted and commissioned by a Gas Safe registered engineer
£21.67
£18.06 ex. VAT · VAT at 20%
Same-day dispatch
Ordered by 4pm Mon–Fri, 10:30am Sat.
30-day returns
Unused, in original packaging.
What it is
The gas connection tube is a pipe assembly used on Glow-worm Ultracom 2 boilers, carrying gas from the appliance isolation point to the gas valve assembly. It is supplied under Glow-worm part number 0020097313. The tube forms part of the boiler's gas train and must be fitted and sealed correctly to maintain appliance tightness.
Signs this part needs replacing
- Visible corrosion, pitting or discolouration on the tube or its connections
- A gas smell or a detected leak at the tube joints
- Kinking, crushing or deformation of the tube
- Damaged or poorly seating connection faces preventing a sound seal
- The boiler failing a gas tightness test at the gas train
Before you order
- Confirm your boiler model against the fit list above before ordering
- Check the part number 0020097313 against the manufacturer's parts list for your appliance
- Inspect the existing tube routing and connections so the replacement matches the installed arrangement
- Gas-carrying components must be fitted and commissioned by a Gas Safe registered engineer
Compliance
| Alternative numbers | 1340366 |
|---|
| Make | Model / assembly | Reference | Years | Fitment |
|---|---|---|---|---|
| GLOWWORM ULTRACOM 2 30SXi | 41-019-14 | 41-019-14 | — | — |
| GLOWWORM ULTRACOM 2 35CXi | 47-019-12 | 47-019-12 | — | — |
Documents & drawings
Everything we hold for this part. Where a document exists but we don't hold it, the technical team will source it from the manufacturer — usually the same working day.
No technical questions yet for this part.
Not sure which part?
Search by part number, product name or brand — our technical team confirms fitment before anything is dispatched.
